MIA - Former Eastern Main Base Closure

The collection of soil and groundwater samples associated with the assessment and closure of the Former Eastern Airlines Main Base Industrial Waste Treatment System. The information collected was documented in a report.  Work involved close coordination with Tenants and Aviation Department Staff.

Comprised of:

The Project Scope of Work Includes:

 

  • Site Surveys

  • Historical Data Compilation

  • Soil and Groundwater Sampling

  • Site Assessments

  • Removal and Installation of Underground

  • Above ground Fuel Storage Tanks/Systems

  • Preparation of Engineering Reports

  • Remedial Action Plans (RAP)

  • O&M of Remediation Equipment