HUD - Underground Storage Tank Removal
The scope of services for this project involved the removal of existing underground storage fuel tanks at four (4) HUD sites in Miami-Dade County. The scope also involved the preparation of Tank Closure Reports, which included the documentation of the tanks removals and the assessment of the soil and groundwater at each site. BND coordinated the installation of new Above Ground Fuel Tanks for the emergency generators at the site.
Comprised of:
The Project Scope of Work Includes:
-
Site Surveys
-
Historical Data Compilation
-
Phase I and Phase II Reports
-
Soil and Groundwater Sampling
-
Site Assessments
-
Removal and Installation of Underground
-
Above ground Fuel Storage Tanks/Systems
-
Preparation of Engineering Reports
-
Remedial Action Plans (RAP)
-
O&M of Remediation Equipment